PERFORMING SERVICES ON HIGH LEVEL
Design processing of technological units and power generating equipment
TR 110/22 kV SLANÝ
Complete refurbishment of transformer station
DPD 1600V1, V2, V3 LINE – JIŽNÍ SVAHY
Complete delivery of the electrical part and control system
ELECTRICAL EQUIPMENT MAINTENANCE
Assurance of availability in 24/7 mode

News

31.01.2019

Within the restructuring process, as of 01.02.2019 the Department of Automation Technology is transferred from our company to the company Bohemia Controls s.r.o., where this department will operate with the same personnel and the same scope of activities.

26.11.2018

„Supply, assembly and putting into operation of the electric parts of OKJ (Removable walking unit) 130P-3“ is a further job order in the premises of the company Severočeské doly, a.s. The order party is the compaby PRODECO, a.s. The delivery term of the contract is in the first half of 2019.

24.10.2018

The company United Energy, a.s., within the contractual option, placed with us an order to implement the third application of the HV frequency converter with the synchronous BY–PASS unit for the  primary forced-draft fan of the boiler in the Komořany Heating Plant. This time the order concerns the boiler K10.

23.10.2018

We provide replacement of the 220 kV, 63 MVA transformer for the company LDS Sever, spol. s r.o.. The job concerns the supply of a new machine, modification of the 22 kV substation, replacement of protections and modification of the control system. The job order includes the elaboration of the project documentation.

31.08.2018

We are taking part in the modernization of the HV distribution equipment at the voltage level 6 kV. The order is carried out under the name „Reconstruction of the HV switchboard TR128“. The completion date was set at 12/2018.

13.06.2018

„Reconstruction of the excitation system and electrical protections TG4“ is another job order, which we are implementing in the premises of the  Komořany Heating Plant. The matter concerns the modernization of the excitation of the 32 MW generator of the condensing turbine TG4.

04.06.2018

The company Bohemia Müller s.r.o. succeeded in the tender for implementation of the job order   „Modernization of the 6 kV switchboard – P102 PS5“ in the premises of the company Mondi Štětí a.s.. The completion date of the implementation was set at October 2018. Thus, our company is becoming an established supplier for this customer.

21.05.2018

Our company is continuing the cooperation with our business partner ŠKODA AUTO, a.s. and is repairing two main transformer stations TSS2 and TSS3 in the hall M14. It is an organizationally demanding and time-consuming contract, which also includes elaboration of the implementation project documentation.

09.04.2018

In the field of the transmission system the company ČEPS, a.s. assigned our company to implement a job order „TAB – repair of the switch by means of replacement of ADA 03“. It is another success of our company in this customer´s tenders.

15.03.2018

Our company is taking part in the execution of the mining contract „Modernization of the long distance conveyor transportation, 1200 mm wide“. This is a complete reconstruction of the belt conveyor drive stations, which are operated by the company Vršanská uhelná, a.s. The period of execution of the contract is spread over three years; its subject-matter also includes elaboration of the project documentation.

06.03.2018

We provide implementation of the contract „N4a – replacement of the reclaimer“ for our established partner – the company PRODECO, a.s. The final customer is the company Severočeské doly, a.s.

13.12.2017

The company Bohemia Müller s.r.o. has succeeded in the tender for implementation of the job order „Modernization of the 6 kV switchboard – 9NZ oxygen delignification“. The order party is the company Mondi Štětí a.s. This is a complex order on a “turnkey” basis. The completion date of the implementation is set at June 2018.

04.12.2017

We have been notified by the company United Energy, a.s. of our success in the tender „Installation of the optimizing equipment for the fans of the boiler K07“. It is a repeated, technically very demanding application of HV frequency convertor with synchronous BY–PASS unit for primary forced-draft fans of the boiler in the Komořany Heating Plant.

26.06.2017

As a member of the association of partners we have been chosen for the implementation of the contract „TR Triangle – new R 110 kV“. Thus, our company remains one of the established partners of the final client ČEZ Distribuce, a.s. in the field of reconstruction and implementation of new substations and transformer stations.

09.06.2017

We have succeeded in the tender for implementation of the contract in the mining industry under the name „Reconstruction of the substations TSN 28 and TSN 36“, the order party is the company Severočeské doly, a.s.

05.06.2017

In the automotive industry we have obtained a further job order „ Reconstruction of the HV substation E28 in the hall M11A“.This is a complex order on a “turnkey” basis, including the project documentation.  The contractual partner is the company D&D ELEKTROMONT s.r.o.

31.03.2017

The company Bohemia Müller s.r.o. has become a business partner of the company Chemoprojekt, a.s. for the project „IRAQ – BASRAH Crude Distillation Unit No.4, LPG Unit“. The subject-matter of the order is supply of the LV and HV switchboards, transformers, busbar systems, UPS sources and the complete control system.

30. 03. 2017

The company Bohemia Müller s.r.o. has been selected as an implementer of the order „HV substation  for the timber-yard C108“. The submitter is the company Mondi Štětí a.s. and the order involves implementation of the work on a “turnkey” basis. The date of completion of the implementation is autumn 2017.

22.02.2017

Bohemia Müller s.r.o. succeeded in the tender for implementation of the job order of the company ČEPS, a.s. and during the following four years will provide regular maintenance of the technological equipment of the substations: Chotějovice, Čebín, Kletné, Horní Životice a Lískovec.

04.01.2017

Our company succeeded in the tender for implementation of the job order „P23 – Modernization of the Control Systems, including HV + LV electro-part / 3rd overburden section – PD 32, 33, RV31 + VM31“. The order involves elaboration of the project documentation of the construction for the business partner – company Sokolovská uhelná, právní nástupce, a.s.

16.12.2016

We signed the contract for implementation of the order „Modernization of the switchboard at 10kV substation B – r3“ with our long-standing business partner - company Constellium Extrusions Děčín s.r.o. The scope of the performance consists in elaboration of the project documentation of the construction, supply of the HV switchboard, assembling material, disassembling works and installation of the new equipment and its subsequent testing and putting into operation. 

14.12.2016

The company Bohemia Müller s.r.o. has been selected as an implementer of the order „TR 400/110kV Neznášov – compensation“. The submitter is the company ČEPS, a.s. and the order involves implementation of the work on a “turnkey” basis. The date of completion of the implementation is autumn 2017. 

24.10.2016

By signing the contract with the company UniControls a.s. for delivery and assembly of the power supply part at TS Kouřim, we became a part of the supply model for the final client NET4GAS, s.r.o. The job concerns an interesting application in gas industry. 

31.08.2016

By signing the PAC Report on 31.08. 2016 we have accomplished the organizationally demanding order „New source 660 MWe in the Ledvice Power Plant – OB33“.

13.05.2016

Our activities in automotive industry bore fruit by signing the contract for implementation of the order „Object D13 – replacement of the HV switchboard and CENTRAL STOP“. The client is nobody, but the company ŠKODA AUTO a.s. This is a complex order on a “turnkey” basis, including the project documentation. 

13.05.2016

Our long-standing partner in the branch of mining industry – the company PRODECO a.s. concluded with our company a contract for the order „Overall repair and modernization of the spreader ZP6600/12 – electro-part and CS“. A final user and an owner of the machine is the company Sokolovská uhelná, právní nástupce, a.s. 

13.05.2016

Our long-standing partner in the branch of mining industry – the company PRODECO a.s. concluded with our company a contract for the order „Overall repair and modernization of the spreader ZP6600/12 – electro-part and CS“. A final user and an owner of the machine is the company Sokolovská uhelná, právní nástupce, a.s. 

14.03.2016

The association of partners UNEX and Bohemia Müller concluded with their business partner, the company Sokolovská uhelná, právní nástupce, a.s., the contract for work - implementation of the order „ Overall repair and modernization of the wheel excavator KU800/12-R“. Our company will take part in the realization of electrical installations and control systems. Immediately after signing of the contract, demanding project activities were commenced.

10.03.2016

We succeeded in the tender for implementation of the order in the branch of mining industry, named „Reconstruction of the belt conveyor 1800 mm – PD218“,contractor is the company PRODECO a.s. and a final user is the company Severočeské doly, a.s.

19.02.2016

We obtained the statement from the company United Energy, a.s., notifying of the contract award decision in the tender „Installation of the optimizing equipment for the boiler K08 fan “. The matter concerns a technically very demanding application of HV frequency convertor with synchronous BY–PASS unit for primary forced-draught fan of the boiler in the Komořany Heating Plant.

23.03.2016

The company Doosan Škoda Power s.r.o. placed an order with our company for complete electrical installation works for the project „Lisbjerg Biomasseanlæg“, which is implemented in the territory of Denmark. The order concerns demanding works from the point of view of coordination with high logistics requirements.

19.02.2016

We obtained the statement from the company United Energy, a.s., notifying of the contract award decision in the tender „Installation of the optimizing equipment for the boiler K08 fan “. The matter concerns a technically very demanding application of HV frequency convertor with synchronous BY–PASS unit for primary forced-draught fan of the boiler in the Komořany Heating Plant.

04.01.2017

Our company succeeded in the tender for implementation of the job order „P23 – Modernization of the Control Systems, including HV + LV electro-part / 3rd overburden section – PD 32, 33, RV31 + VM31“. The order involves elaboration of the project documentation of the construction for the business partner – company Sokolovská uhelná, právní nástupce, a.s.

16.12.2016

We signed the contract for implementation of the order „Modernization of the switchboard at 10kV substation B – r3“ with our long-standing business partner - company Constellium Extrusions Děčín s.r.o. The scope of the performance consists in elaboration of the project documentation of the construction, supply of the HV switchboard, assembling material, disassembling works and installation of the new equipment and its subsequent testing and putting into operation. 

14.12.2016

The company Bohemia Müller s.r.o. has been selected as an implementer of the order „TR 400/110kV Neznášov – compensation“. The submitter is the company ČEPS, a.s. and the order involves implementation of the work on a “turnkey” basis. The date of completion of the implementation is autumn 2017. 

24.10.2016

By signing the contract with the company UniControls a.s. for delivery and assembly of the power supply part at TS Kouřim, we became a part of the supply model for the final client NET4GAS, s.r.o. The job concerns an interesting application in gas industry. 

31.08.2016

We accomplished the organizationally demanding order by signing the PAC report on 31.08. 2016.  

In cooperation with the company EGEM s.r.o. we have been selected for implementation of the order „Fifejdy – construction of new R 110/22 kV“. Thus, our company still remains being one of the well-established partners of the final client ČEZ Distribuce, a.s. in reconstruction and implementation of new substations and distribution substations.

13.05.2016

Our activities in automotive industry bore fruit by signing the contract for implementation of the order „Object D13 – replacement of the HV switchboard and CENTRAL STOP“. The client is nobody, but the company ŠKODA AUTO a.s. This is a complex order on a “turnkey” basis, including the project documentation. 

13.05.2016

Our long-standing partner in the branch of mining industry – the company PRODECO a.s. concluded with our company a contract for the order „Overall repair and modernization of the spreader ZP6600/12 – electro-part and CS“. A final user and an owner of the machine is the company Sokolovská uhelná, právní nástupce, a.s. 

23.03.2016

The company Doosan Škoda Power s.r.o. placed an order with our company for complete electrical installation works for the project „Lisbjerg Biomasseanlæg“, which is implemented in the territory of Denmark. The order concerns demanding works from the point of view of coordination and high logistics requirements. 

14.03.2016

The association of partners UNEX and Bohemia Müller concluded with their business partner, the company Sokolovská uhelná, právní nástupce, a.s., the contract for work - implementation of the order „ Overall repair and modernization of the wheel excavator KU800/12-R“. Our company will take part in the realization of electrical installations and control systems. Immediately after signing of the contract, demanding project activities were commenced.

10.03.2016

We succeeded in the tender for implementation of the order in the branch of mining industry, named „Reconstruction of the belt conveyor 1800 mm – PD218“,contractor is the company PRODECO a.s. and a final user is the company Severočeské doly, a.s.

10.03.2016

We succeeded in the tender for implementation of the order in the branch of mining industry, named „Reconstruction of the belt conveyor 1800 mm – PD218“,contractor is the company PRODECO a.s. and a final user is the company Severočeské doly, a.s.

19.02.2016

We obtained the statement from the company United Energy, a.s., notifying of the contract award decision in the tender „Installation of the optimizing equipment for the boiler K08 fan “. The matter concerns a technically very demanding application of HV frequency convertor with synchronous BY–PASS unit for primary forced-draught fan of the boiler in the Komořany Heating Plant.

20.01.2016

Bohemia Müller s.r.o. participates in the removal of the fire effects in the UNIPETROL RPA s.r.o. Ethylene Unit.

13.11.2015

Our company in cooperation with the PRODECO, a.s. company succeeded in the public contract for implementation of the job order “SVHS1 – reconstruction of electrical parts“. The issue concerns a significant contract for the final customer, the company Severočeské doly, a.s., which thereby confirms a long-term cooperation with this business partner.

20.10.2015

The job order, which has been placed with us by the ROGER Energy a.s. company, is very interesting as far as its scope is concerned. The company belongs to the portfolio of the companies connected with the Association for Chemical and Metallurgical Production, a.s. The job order is distinguished with high term demandingness in respect of the required scope. Our custom managers have already intensively commenced works on the coordination time schedule, which will constitute a basis for the successful implementation of works.

30.09.2015

The company TENEL ČR s.r.o., which is an established supplier of excitation systems, has placed with Bohemia Müller s.r.o. an order for implementation of the assembly part of the job order „ELI II – Lipno : reconstruction of excitation“. The issue concerns a professionally interesting job in one of the Vltava Cascade hydroelectric power stations.

31.07.2015

Our long-standing business partner – the ŠKODA AUTO, a.s. company has placed with us an order for the design works on the replacement of HV distribution stations in the M13 and D13 industrial halls. This measure concerns the application of fire precautions in the Mladá Boleslav plant. For our designers it represents the extension of professional cooperation with the technical section of the investor.

29.06.2015

Our company has won the tender of the submitter - Vršanská uhelná, a.s. for implementation of the job order „Modernization of the PD221-PD224 drives“. The point of the issue is to implement the modernization of the distribution equipment in the total number of four belt conveyors in the form of the “turnkey contract”, including elaboration of the design documentation.

22.06.2015

Bohemia Müller s.r.o. has succeeded in the tender of the submitter ČEPS Invest, a.s. for implementation of the contract „VYS – modification of R420kV for DyZ II“. The subject-matter of the contract is implementation of the replacement of current paths of the EHV disconnectors, including supply of the equipment.

15.06.2015

Further contract in the sphere of power plant industry is implementation of the contract „Reconstruction of the 10,5kV distribution station for T10, T12 and T13“. The contractor is the company Opatovice, a.s. Power Plants; the performance in the construction site is planned in the period from 06/2015 to 12/2015.

23.03.2015

Company Bohemia Müller s.r.o. has succeeded in the tender for implementation of the job order „Reconstruction of the LV distribution station TS 254 in the st. 2535“. Contractual partner is the company UNIPETROL RPA s.r.o.. The implementation of the order itself will take place within the period from 03/2015 to 12/2015.

17.03.2015

Company Bohemia Müller s.r.o. has won the tender for implementation of the contract „Reconstruction of the 6 kV switchboards in the 6th overburden section PD521, PD525“. The matter concerns a complete modernization of the distributing equipment in the Bílina Mines. The term of accomplishment of the implementation is determined in the first half of the year 2015.

22.02.2015

Our company has been chosen as an implementer of the works contract „General overhaul of digging wheel excavator KU300S.46/K107 – electro-mounting works“. The submitter is the company Slovácké strojírny a.s., with the final user - the company Vršanská uhelná, a.s..

16.01.2015

ttc s.r.o. as a partner company has placed with our company an order for implementation of electrical part of the contract „MISURATA, Libya – Replacement of frequency convertors in the discharger of the ship“. It is one of further acquirements of our specialists in the automated technology department.

18.12.2014

The company Bohemia Müller s.r.o. has succeeded in the tender for implementation of the job order „Reconstruction of the HV distribution station in the st. 3609 – ammonia plant“. Contractual partner is the company UNIPETROL RPA s.r.o. The job order implementation itself will take place during the period from 01/2015 to 06/2015.

11.12.2014

The company Severočeské doly, a.s. has concluded the contract with our company for the provision of service and maintenance activities in the sphere of Control and Management Systems for the year 2015.

02.12.2014

Kovoprojekta Brno a.s., as one of the major business partners, has placed our company an order for complete implementation of the works „Reduction of environmental impacts during production of epichlorohydrin and hydrochloric acid - electro-equipment and CMS for the final customer CHS Epi, a.s. The matter concerns elaboration of the project documentation and subsequent “turnkey” implementation.

12.11.2014

The company Bohemia Müller s.r.o. has won the tender for implementation of the job order „Reconstruction of protection of the distribution system – stage 6“. The point of issue is complete modernisation of the protection system of 22 kV distribution stations designated   E29, M6 and E31 in the premises of the long-standing business partner ŠKODA AUTO a.s.

20.10.2014

Further job-order contract in the industrial section is implementation of the works „Construction of the technological hall DISCUS“. The contractor is the company ISTAR spol. s r.o.; the performance of work in the construction site is planned within the period from 02/2015 to 04/2015.

03.10.2014

The company TAMERO INVEST s.r.o. has assigned us complete modernisation of the HV distribution equipment in the 6 kV voltage level. The job-order is recorded under the name „Reconstruction of the TR237 HV switchboard“. The accomplishment date has been determined: 03/2015.

01.09.2014

The company Bohemia Müller s.r.o. has been chosen as an implementer of the job-order contract named „Final heat receiver – electro-equipment“ in the Dukovany Nuclear Power Plant. The submitter is the company OT Energy Services a.s.; the term of performance is fixed within the period from 09/2014 to 01/2016.

17.07.2014

Employees of our company have commenced preparatory activities for implementation of the job-order „Modernisation of 4pcs of the kiosk-type transformers at MM Jana“, which was assigned to us by the purchase department of the Severočeské doly, a.s. company. Implementation of the job is stated at turn of October and November 2014.

30.06.2014

Our company has been chosen as an implementer of the job-order „Reconstruction of electro-equipment of the mobile belt cable truck No. 5“. The job submitter is the company Vršanská uhelná a.s.; the term of performance is determined within the period from 06/2014

18.06.2014

The company Bohemia Müller s.r.o. has won the tender for implementation of the job order „Reconstruction of the 6 kV distribution station of leakage 1B1“. The subject-matter is complete modernisation of the distribution equipment in the existing technology of the Chvaletice Electric Power Plant. The determined term of accomplishment is in October 2014.

02/06/2014

Our company won the tender for the contractor of “Modernization of Coaling at Power Plant No. 3 in Ulaanbaatar”. The contracting authority is the Czech Republic – the Czech Development Agency. The subject of the performance will be implemented from 2014 to 2016. In this way our company draws on our long standing operation in Mongolia.

22/05/2014

Bohemia Müller s.r.o. is the official partner of the 6th “Power Distribution System” expert conference focusing on the Development, renewal and maintenance of EHV, VHV and HV.

19/05/2014

Bohemia Müller s.r.o. entered into an agreement with ZAT a.s. regarding the granting of the right to use the Pertinax software for applications run by the Severočeské doly a.s. In this way we start closer cooperation with an established supplier of controlling systems.

13/05/2014

Severočeské doly, a.s., announced a tender and our company was awarded the contract for “CS 94 Filling Station – electric part”. PRODECO, a.s. will act as the contractor, while the contract is to be performed from 05/2014 to 10/2014.

25/04/2014

United Energy, a.s. placed an order with our company regarding “Restoration of Lightning Surge Protection at R6KTI Switchboard Room in Komořany Heating Plant”. This order involves a complete replacement of the lightning surge of the HV switchboard including the links to the SCADA control system.

17/04/2014

Bohemia Müller s.r.o. won the tender for the implementation of the “PD213 Modernization” contract. The end customer is Vršanská uhelná a.s. The contract will be performed from 05/2014 to 12/2014.

09/04/2014

Our company was selected to implement the contract of “Electric Equipment Including Switchboard and PVZ2500P Belt Stacker Operator Centre”. The end customer is Severočeské doly a.s., while the contractor is PRODECO, a.s.

18/02/2014

Our company won the tender for the contract of “TR Podbořany R 110kV – Isolator Current Routes”. The contracting authority and, at the same time, the contracting partner is ČEZ Distribuce, a.s. The contract will be realised between 06/2014 and 09/2014.

23/01/2014

ŠKODA PRAHA Invest s.r.o. selected our company to implement the “Gas Boiler Facility ELE” project in a tender. The project involves the building of a new unit and Bohemia Müller s.r.o. will provide for the electric, measurement and regulation and management control system parts of the contract. The implementation is to take place in 2014.

22/01/2014

Bohemia Müller s.r.o. has won in the selection procedure for implementation of the "PD257 and PD262 Belt Conveyor Reconstruction : Electric Part and the Control and Management System" contract. It is a complete modernization of the belt conveyor equipment and application of the frequency control and new control system. The implementation date is scheduled for the first half of 2014.

03/01/2014

It was within the construction of the new 660MWe source in the Ledvice Power Plant that we won implementation of the business packet "OB08 – Delivery of Heat : Electrical Part" from KRÁLOVOPOLSKÁ RIA, a.s. By doing so we continue in the long-term successful company operation in this contract.

23/12/2013

The Automation Engineering Department of our company commenced the preparation activities to successfully implement the "Recovery of Stations and Data Model in TU-DB Central Control Room" contract awarded to us by the long-term trading partner, Severočeské doly, a.s.

23/12/2013

We were awarded implementation of the "SV20 Throw-Off Carriage Modernization" contract by PRODECO, a.s. It is the delivery of complete Electrical Part and Control and Management System with a deadline in April 2014.

02/10/ 2013

Our company won the "Modification of HV and LV Internal Consumption Mains - LDS R200 and T200" contract in the selection procedure. The Client is UNIPETROL RPA s.r.o.. As stipulated in the agreement, the contract implementation shall be completed in July 2014.

26/09/2013

Employees from the Design Department started to work on creation of the design documents for the tripping vehicle SHVS1 – the electric installation parts and the monitoring and control systems. It is a contract for the end client Severočeské doly, a.s. with scheduled date of delivery in 10/2013.

23/09/2013

Based on a notice from PRODECO, a.s., work was started on the contract “Reconstruction of the K1a Crushing Line, Including the Feeder and Chutes”. The end customer is Severočeské doly, a.s. It is expected that the final date of completion will be in 05/2014.

04/09/2013

Bohemia Müller s.r.o. won a tender procedure for the contract “Reconstruction of MR68 Switchboard, Including T69”. The end customer is UNIPETROL RPA s.r.o. The actual job will be carried out between 10/ 2013 and 04/2014.

02/09/2013

EGÚ Brno, a.s. subcontracted us for a part of the contract “Repair to the Disconnection Programme at ŠKO- ENERGO s.r.o. Mladá Boleslav”. It is presumed that implementation will be completed in 10/2013.

02/08/2013

Our company was awarded the contract “Replacement of the Control System of the Družba Oil Pipeline – Delivery and Modification of Power Supply Equipment”. The client is CSE-CONTROLS, s.r.o. and implementation will take place between 08/2013 and 06/2015.

20/06/2013

United Energy, a.s. awarded the "Refurbishment of the R6KTII switchroom emergency flash protection device" job order to our company. It is a complete "turn-key" implementation. The job order will be implemented by the close of 2013.

12/06/2012

Within the selection procedure published by Severočeské doly, a.s. our company was awarded implementation rights for the "Boosting the pumping technology of ČS 3/7 Libouš – South PT – Electrical Part" job order. The company SD – 1.strojírenská, a.s., is the contractor and the performance is specified for completion between 07/2012 and 12/2012.

22/05/2013

Our company entered into the implementation contract for the Microsoft Dynamics NAV 2013 information system with NAVISYS s.r.o. The date for launching the system trial run is set for the close of 2013.

17/05/2013

A contract to provide common maintenance and service tasks in the electrical field was signed with the company Coal Services a.s..

30/04/2013

Severočeské doly, a.s. and our company entered into a contract to provide service tasks and maintenance in the area of Control and Management Files (CMF) for 2013.

26/04/2013

Our company started preparatory activities to implement the "Refurbishment of controlled K2000.1/K101 turntable drives" job order that was awarded to us by the Procurement Department of Severočeské doly, a.s. The job order implementation is set for the turn of October and November 2013.

18/04/2013

Implementation of the "Complex redevelopment of Prunéřov II – OB09 Power Plant – Desulphurisation: Electrical part" job order was awarded to us by KLEMENT a.s. The implementation date is set within the timeframe of 06/2013 and 01/2014. It is a continuation of successful collaboration in this area with the Ledvice Power Plant.

12/03/2013

Our company won the "Repair of r4 – 10 kV switchboard in Transformer Station C" job order. The client is Constellium Extrusions Děčín s.r.o. and the implementation will take place in 07-08/2013. The place of fulfilment is the Client's industrial facility in Děčín.

06/02/2013

We have won the "TR Milín – Repair of ADA 01, 02 switches" job order in the selection procedure. The client is ČEPS Invest, a.s. and the subject-matter of performance is the repair of 2x 220 kV switches by way of replacement. The job order will be implemented in two stages with the completion date set for 09/2013.

30/01/2013

A long-term business partner, ŠKO-ENERGO s.r.o., contracted us to perform the "M12A – Replacement of T1 and T10 transformers" action. Implementation will take place at the ŠKODA AUTO a.s. facility in Mladá Boleslav in 03/2013.

01/01/2013

Bohemia Müller s.r.o. became a member of the Czech and Moravian Electrical and Electronic Association.

31/12/2012

At the close of 2012 a contract for work was signed with TAMERO INVEST s.r.o. Kralupy nad Vltavou to implement the "Power delivery and adaptations of existing switchroom" job order. It involves power delivery from the new 34 MW internal combustion turbine into the 110 kV switchroom that will be refurbished within the job order. Implementation and commissioning are planned for 09/2013.

07/12/2012

Our company succeeded in the selection procedure for implementation of the "Retrofitting and reworking the DNT PD 275 belt conveyor – Electrical part" job order. The end customer is Severočeské doly, a.s., and the business partner is SD – 1.strojírenská, a.s. The implementation completion date is 04/2013.

19/11/2012

The symbol that emphasised the dynamism of our company and its position in the market undergoes a change 15 years after Bohemia Müller s.r.o. was established.

08/11/2012

Bohemia Müller s.r.o. successfully completed implementation of the "HV switchroom monitoring" job order that was ordered by Coal Services a.s. Its aim is to assure the transmission of binary signals from the HV switchrooms of Vršanská a Litvínovská uhelná, a.s. to the visualisation workplace.

05/11/2012

The Trmice, a.s. Heating Plant awarded us with implementation of the "R6K5 switchboard operational repair and launch after fire" job order. The aim is the delivery and installation of 22 UniGear ZS1 HV cubicle switchboard panels manufactured by ABB s.r.o., which is equipped with modern REF615 protection terminals. Performance also includes complete projection pursuits and assurance of the connectivity to the Honeywell control system. The anticipated implementation completion date is 03/2013.

01/11/2012

The Ústí nad Labem Division was newly formed in the corporate organisation structure. Its duty is the coverage of activities in the selected localities of the Ústí nad Labem Region.

09/10/2012

On 9 October 2012 a contract for work was signed with United Energy, a.s. to implement the "EN2 electric feed pump frequency converter installation in the Komořany Heating Plant" job order. The aim is the application of a water cooled 1,440 kW frequency controlled drive with a voltage level of 690 V. The subject-matter of performance also includes implementation of the HV part, mechanical and constructional part as well as adaptations to the technological control system.

25/09/2012

On 25 September 2012, the final completion certificate to confirm the successful completion of Stage 2 of the job order to "Retrofit a chemical water treatment plant control room and measuring and regulation equipment" was signed with representatives of the TE4 power plant, which was personally attended by Mrs. Ivana Grollová, Ambassador of the Czech Republic to Mongolia in the Mongolian capital, Ulan Bator.

05/09/2012

Bohemia Müller s.r.o. became a system integrator of Rockwell Automation products for 2012, thereby extending the offered services portfolio in the area of industrial automation.

17/07/2012

Based on its positive attitude to the submitted bid, Severočeské doly, a.s. awarded us with the implementation of the "35 kV cable distributions – Skrývka mining plant 2012" job order. It involves delivery and routing of 35 kV voltage level cables for the technical equipment to mine skrývky in 2012.

13/07/2012

Upon the obligatory notification of Vršanská uhelná, a.s. works were started on the "Retrofitting PD252 and PD253 belt conveyors" job order. It involves modernisation of the switchroom and the electrical equipment on individual PD's, replacement of the control desk in a cabin, replacement of sensors and instrumentation, including cables. The implementation completion date is 12/2012.

06/06/2012

Our company succeeded in the selection procedure for the implementation of the "Development of a new third coal withdrawal system, DNT – Electrical part" job order. The end customer is Severočeské doly, a.s., and the business partner is SD – 1.strojírenská, a.s. The actual job order implementation will take place between 07/2012 and 12/2012.