PERFORMING SERVICES ON HIGH LEVEL
Design processing of technological units and power generating equipment
TR 110/22 kV SLANÝ
Complete refurbishment of transformer station
DPD 1600V1, V2, V3 LINE – JIŽNÍ SVAHY
Complete delivery of the electrical part and control system
ELECTRICAL EQUIPMENT MAINTENANCE
Assurance of availability in 24/7 mode

The company United Energy, a.s., within the contractual option, placed with us an order to implement the third application of the HV frequency converter with the synchronous BY–PASS unit for the  primary forced-draft fan of the boiler in the Komořany Heating Plant. This time the order concerns the boiler K10.