PERFORMING SERVICES ON HIGH LEVEL
Design processing of technological units and power generating equipment
TR 110/22 kV SLANÝ
Complete refurbishment of transformer station
DPD 1600V1, V2, V3 LINE – JIŽNÍ SVAHY
Complete delivery of the electrical part and control system
ELECTRICAL EQUIPMENT MAINTENANCE
Assurance of availability in 24/7 mode

We have been notified by the company United Energy, a.s. of our success in the tender „Installation of the optimizing equipment for the fans of the boiler K07“. It is a repeated, technically very demanding application of HV frequency convertor with synchronous BY–PASS unit for primary forced-draft fans of the boiler in the Komořany Heating Plant.